Lightning Protection Technician (Conventional System)
United Lightning Protection Association (ULPA)
Documents
View Original Document
Individual state requirements may vary. Please contact your local apprenticeship office to ensure this version is suitable to your state’s requirements.
Work Process Content
On the Job Training
Anonymous
44
Skills
8K
OJT hours
Preliminary Work
5
400
Preliminary Work
5
400
- Understanding and utilizing the equipment used in lightning protection system installation per the NFPA780, LPI 175 and UL96a standards for the installation of lightning protection systems, such as air terminals, air terminal bases, fasteners, adhesives, conductor clamps, equipotential bonding clamps and lightning protection grounding equipment, etc.
- Understanding names and uses of the various tools used in the installation of lightning protection systems. Includes utilizing proper care and maintenance of all tools, and what each tool is used for. Tools included will range from hand tools – wrenches, tape measures, screwdrivers, pliers, utility knives, socket wrenches, levels, hammers, etc. to battery powered and corded tools – demolition hammers, hammer drills, reciprocating saws, exothermic welding equipment, corded and cordless drills, etc.
- Implementing the basic lightning protection system installation methods at a commercial and residential job site safely. Including a minimum of OSHA safety training and safety training for all tools and materials.
- Selecting proper materials and how to properly load into work vehicles and what the procedures are for restocking of materials.
- Applying procedures for documenting work hours and all administrative tasks that apply.
Residential New Construction Lightning Protection System Installation
7
800
Residential New Construction Lightning Protection System Installation
7
800
- Assisting in gathering materials from stock room.
- Loading and unloading materials and tools at the job site.
- Air terminal installation for concealed and exposed systems in compliance with LPI 175, NFPA 780, and UL96a standards for lightning protection system installation.
- Installation of lightning protection conductors and in compliance with fastening requirements and conductor routing rules set forth in LPI, UL, and NFPA standards.
- Installation of grounding equipment, ground rods, plates, and radials using equipment rated for lightning protection systems and direct burial.
- Installation of equipotential utility bonds and equipotential secondary bonds. Equipotential secondary bonding at the roof level includes bonding to plumbing vents, drains, metal chimneys, vents, roof top units, antennas and any other grounded metal object located within the required bonding distance to the lightning protection system. This bonding is installed to avoid the potential for flashover in the event of a lightning strike. This bonding is required per NFPA 780 4.15 and is not a part of the electrical system.
- Working with power tools, hand tools, and ladders. Utilizing proper and safe use of all types of ladders and lifts.
Commercial New Construction Lightning Protection System Installation
11
2.5K
Commercial New Construction Lightning Protection System Installation
11
2.5K
- Assisting in gathering materials from stock room.
- Loading and unloading materials and tools at the job site.
- Selecting and using the rules of air terminal installation for commercial applications in compliance with LPI 175, NFPA 780 and UL96a standards for lightning protection system installation.
- Installation of lightning protection conductors and in compliance with fastening requirements and conductor routing rules set forth in LPI, UL, and NFPA standards.
- Installation of lightning protection grounding equipment, ground rods, plates, and radials using equipment rated for lightning protection systems and direct burial.
- Installation of equipotential utility bonds and equipotential secondary bonds. Equipotential secondary bonding at the roof level includes bonding to plumbing vents, drains, metal chimneys, vents, roof top units, antennas and any other grounded metal object located within the required bonding distance to the lightning protection system. This bonding is installed to avoid the potential for flashover in the event of a lightning strike. This bonding is required per NFPA 780 4.15 and is not a part of the electrical system.
- Installation of roof and wall penetrations and bonding to structural steel. Working with roofing contractors and with lightning protection rated roof penetration hardware and components.
- Exothermic welding from conductor to steel, from conductor to conductor, and from conductor to ground rods.
- Exothermic welding from conductor to steel, from conductor to conductor, and from conductor to ground rods.
- Bonding to rebar where required with masonry construction per NFPA780 4.18.3 and 4.16.1.2. This bonding is required for intermediate level interconnection of lightning protection system components.
- Working with power tools, hand tools, and ladders.
Residential Existing Construction Lightning Protection System Installation
3
800
Residential Existing Construction Lightning Protection System Installation
3
800
- Installation with safe access to pitched roofs. Use of fall protection and ladders.
- Fastening conductors in compliance with LPI, NFPA, and UL standards on building exterior.
- Installation of equipotential utility bonds and equipotential secondary bonds. Equipotential secondary bonding at the roof level includes bonding to plumbing vents, drains, metal chimneys, vents, roof top units, antennas and any other grounded metal object located within the required bonding distance to the lightning protection system. This bonding is installed to avoid the potential for flashover in the event of a lightning strike. This bonding is required per NFPA 780 4.15 and is not a part of the electrical system.
Commercial Existing Construction Lightning Protection System Installation
6
1.5K
Commercial Existing Construction Lightning Protection System Installation
6
1.5K
- Conduit installation meeting bonding, fastening, and material compatibility requirements in LPI, NFPA, and UL standards.
- Fastening conductors in compliance with LPI, NFPA, and UL standards on building exterior.
- Installation of equipotential secondary bonds. Equipotential secondary bonding at the roof level includes bonding to plumbing vents, drains, metal chimneys, vents, roof top units, antennas and any other grounded metal object located within the required bonding distance to the lightning protection system. This bonding is installed to avoid the potential for flashover in the event of a lightning strike. This bonding is required per NFPA 780 4.15 and is not a part of the electrical system.
- Primary bonding to commercial utilities per standards.
- Excavation and backfill to original conditions.
- Wall and roof penetrations as required for bonding.
Lightning Protection System Maintenance and Repairs
4
800
Lightning Protection System Maintenance and Repairs
4
800
- System evaluation for compliance with LPI, NFPA, and UL standards.
- Conductor splicing, sectional repairs, and replacement as needed. Understanding of allowable lightning protection conductor sizes per NFPA, LPI, and UL.
- Air terminal repair, extensions, or replacement.
- Repairs to secondary and utility bonds.
Lightning Protection System Evaluation and Testing
3
600
Lightning Protection System Evaluation and Testing
3
600
- Continuity testing of air terminals and grounding system to verify proper installation and system continuity on new and existing lightning protection systems.
- Ground Resistance Testing. Testing of newly installed grounding, ground grids, and existing grounding to verify proper functioning of a lightning protection system or measuring resistance for compliance with project specifications.
- Visual inspection of all components of a lightning protection system; air terminals, conductors, grounding, bonding, and surge protection.
Documentation and Project Oversight
5
600
Documentation and Project Oversight
5
600
- Recording of system installation for all concealed components.
- Daily logs and proper documentation of project progress.
- Job Site Analysis. Evaluation of safety risks and hazards specifically related to the installation of lightning protection system components.
- Preparation of as-built drawings. Recognizing and understanding drawing symbols for lightning protection systems including air terminals, ground rods, roof penetrations and bonding.
- Communicating professionally with all customers, site supervisors, other sub-contractors, and any other project contacts.
Related Instruction Content
Training Provider(s):
1K
RI hours
Classroom Modules / Performance Based Work Process (First Year) - Introduction to Construction Terms
4
Classroom Modules / Performance Based Work Process (First Year) - Introduction to Construction Terms
4
Classroom Modules / Performance Based Work Process (First Year) - Introduction of Lightning Protection/Grounding Terms
4
Classroom Modules / Performance Based Work Process (First Year) - Introduction of Lightning Protection/Grounding Terms
4
Classroom Modules / Performance Based Work Process (First Year) - Introduction to lightning protection material/equipment
4
Classroom Modules / Performance Based Work Process (First Year) - Introduction to lightning protection material/equipment
4
Classroom Modules / Performance Based Work Process (First Year) - Introduction to Hand Tools
1
Classroom Modules / Performance Based Work Process (First Year) - Introduction to Hand Tools
1
Classroom Modules / Performance Based Work Process (First Year) - Introduction to Power Tools
1
Classroom Modules / Performance Based Work Process (First Year) - Introduction to Power Tools
1
Classroom Modules / Performance Based Work Process (First Year) - Introduction to Blueprints 102
1
Classroom Modules / Performance Based Work Process (First Year) - Introduction to Blueprints 102
1
Classroom Modules / Performance Based Work Process (First Year) - Introduction to the lightning protection standard NFPA 780
· Review Chapters 1-3
· Chapter 1 - Administration
· Chapter 2 - Referenced Publications
· Chapter 3 - Definitions
2
Classroom Modules / Performance Based Work Process (First Year) - Introduction to the lightning protection standard NFPA 780
· Review Chapters 1-3
· Chapter 1 - Administration
· Chapter 2 - Referenced Publications
· Chapter 3 - Definitions
2
Classroom Modules / Performance Based Work Process (First Year) - Introduction to the lightning protection standard UL 96A
· Review Sections 1-5
· Section 1 - Scope
· Section 2 - Components
· Section 3 - Units of Measurement
· Section 4 - Undated References
· Section 5 - Glossary
2
Classroom Modules / Performance Based Work Process (First Year) - Introduction to the lightning protection standard UL 96A
· Review Sections 1-5
· Section 1 - Scope
· Section 2 - Components
· Section 3 - Units of Measurement
· Section 4 - Undated References
· Section 5 - Glossary
2
Classroom Modules / Performance Based Work Process (First Year) - Introduction to the lightning protection standards LPI - Thorough review of LPI-175
12
Classroom Modules / Performance Based Work Process (First Year) - Introduction to the lightning protection standards LPI - Thorough review of LPI-175
12
Classroom Modules / Performance Based Work Process (First Year) - Introduction to the lightning protection standards LPI - Thorough review of LPI-177
12
Classroom Modules / Performance Based Work Process (First Year) - Introduction to the lightning protection standards LPI - Thorough review of LPI-177
12
Classroom Modules / Performance Based Work Process (First Year) - How to read and understand lightning protection installation drawings
2
Classroom Modules / Performance Based Work Process (First Year) - How to read and understand lightning protection installation drawings
2
Classroom Modules / Performance Based Work Process (First Year) - Basic Lightning Protection Installation - Performance Based Training
· Review of workmanship
· Review of cable routing and bends/air terminal spacing
8
Classroom Modules / Performance Based Work Process (First Year) - Basic Lightning Protection Installation - Performance Based Training
· Review of workmanship
· Review of cable routing and bends/air terminal spacing
8
Classroom Modules / Performance Based Work Process (First Year) - Basic Grounding Installation - Performance Based Training
· Types of grounding single electrodes/counterpoises / grids
· Review soil conditions (mixture, rocky, sandy) for installation purposes
8
Classroom Modules / Performance Based Work Process (First Year) - Basic Grounding Installation - Performance Based Training
· Types of grounding single electrodes/counterpoises / grids
· Review soil conditions (mixture, rocky, sandy) for installation purposes
8
Classroom Modules / Performance Based Work Process (First Year) - Safety - Company Safety Training/Testing (Toolbox Topics, etc.)
26
Classroom Modules / Performance Based Work Process (First Year) - Safety - Company Safety Training/Testing (Toolbox Topics, etc.)
26
Classroom Modules / Performance Based Work Process (First Year) - Safety - Introduction to Safety & PPE
2
Classroom Modules / Performance Based Work Process (First Year) - Safety - Introduction to Safety & PPE
2
Classroom Modules / Performance Based Work Process (First Year) - Safety - GHS/SDS
1
Classroom Modules / Performance Based Work Process (First Year) - Safety - GHS/SDS
1
Classroom Modules / Performance Based Work Process (First Year) - Safety - Review OSHA JJ Keller Book (optional)
4
Classroom Modules / Performance Based Work Process (First Year) - Safety - Review OSHA JJ Keller Book (optional)
4
Classroom Modules / Performance Based Work Process (First Year) - Safety - Weather Safety
1
Classroom Modules / Performance Based Work Process (First Year) - Safety - Weather Safety
1
Classroom Modules / Performance Based Work Process (First Year) - Safety - Exothermic Welding Certification
4
Classroom Modules / Performance Based Work Process (First Year) - Safety - Exothermic Welding Certification
4
Classroom Modules / Performance Based Work Process (First Year) - Safety - Basic Fall Protection Certification
4
Classroom Modules / Performance Based Work Process (First Year) - Safety - Basic Fall Protection Certification
4
Classroom Modules / Performance Based Work Process (First Year) - Safety - Basic Ladder Safety Certification
2
Classroom Modules / Performance Based Work Process (First Year) - Safety - Basic Ladder Safety Certification
2
Classroom Modules / Performance Based Work Process (First Year) - Safety - Safe Digging/811
1
Classroom Modules / Performance Based Work Process (First Year) - Safety - Safe Digging/811
1
Classroom Modules / Performance Based Work Process (First Year) - Safety - Horizontal lifeline
1
Classroom Modules / Performance Based Work Process (First Year) - Safety - Horizontal lifeline
1
Classroom Modules / Performance Based Work Process (First Year) - Safety - Fall Rescue
2
Classroom Modules / Performance Based Work Process (First Year) - Safety - Fall Rescue
2
Classroom Modules / Performance Based Work Process (First Year) - Safety - Aerial Lift Certification
2
Classroom Modules / Performance Based Work Process (First Year) - Safety - Aerial Lift Certification
2
Classroom Modules / Performance Based Work Process (First Year) - Safety - First Aid/CPR Certification
6
Classroom Modules / Performance Based Work Process (First Year) - Safety - First Aid/CPR Certification
6
Classroom Modules / Performance Based Work Process (First Year) - Safety - Job Site Analysis Forms
1
Classroom Modules / Performance Based Work Process (First Year) - Safety - Job Site Analysis Forms
1
Classroom Modules / Performance Based Work Process (First Year) - Safety - Onsite Safety Meetings
12
Classroom Modules / Performance Based Work Process (First Year) - Safety - Onsite Safety Meetings
12
Classroom Modules / Performance Based Work Process (First Year) - Safety - Use of PPE
1
Classroom Modules / Performance Based Work Process (First Year) - Safety - Use of PPE
1
Classroom Modules / Performance Based Work Process (First Year) - Safety - Use of ladders/tie off
4
Classroom Modules / Performance Based Work Process (First Year) - Safety - Use of ladders/tie off
4
Classroom Modules / Performance Based Work Process (First Year) - Safety - Use of fall protection (harness/lanyard/ropes/lifelines, etc.)
4
Classroom Modules / Performance Based Work Process (First Year) - Safety - Use of fall protection (harness/lanyard/ropes/lifelines, etc.)
4
Classroom Modules / Performance Based Work Process (First Year) - Use of hand tools - Utilize specific hand tools (wrenches, tape measures, screwdrivers, pliers, utility knives, socket wrenches, levels, hammer drills, etc.)
4
Classroom Modules / Performance Based Work Process (First Year) - Use of hand tools - Utilize specific hand tools (wrenches, tape measures, screwdrivers, pliers, utility knives, socket wrenches, levels, hammer drills, etc.)
4
Classroom Modules / Performance Based Work Process (First Year) - Use of power tools - Utilize specific power tools (demolition hammers, hammer drills, reciprocating saws, exothermic welding equipment, corded and cordless drills, etc.)
4
Classroom Modules / Performance Based Work Process (First Year) - Use of power tools - Utilize specific power tools (demolition hammers, hammer drills, reciprocating saws, exothermic welding equipment, corded and cordless drills, etc.)
4
Classroom Modules / Performance Based Work Process (First Year) - Site clean-up at site based on specific work area (trash, excess material, etc.)
1
Classroom Modules / Performance Based Work Process (First Year) - Site clean-up at site based on specific work area (trash, excess material, etc.)
1
Classroom Modules / Performance Based Work Process (First Year) - Harassment
1
Classroom Modules / Performance Based Work Process (First Year) - Harassment
1
Classroom Modules / Performance Based Work Process (First Year) - Drug and alcohol abuse awareness
1
Classroom Modules / Performance Based Work Process (First Year) - Drug and alcohol abuse awareness
1
Classroom Modules / Performance Based Work Process (First Year) - Installation Performance Based Training - Installation of roof circuit (all types of structures/roofs)
Classroom Modules / Performance Based Work Process (First Year) - Installation Performance Based Training - Installation of roof circuit (all types of structures/roofs)
Classroom Modules / Performance Based Work Process (First Year) - Installation Performance Based Training - Pitched roofs
10
Classroom Modules / Performance Based Work Process (First Year) - Installation Performance Based Training - Pitched roofs
10
Classroom Modules / Performance Based Work Process (First Year) - Installation Performance Based Training - Flat roofs/Multi-level roofs
20
Classroom Modules / Performance Based Work Process (First Year) - Installation Performance Based Training - Flat roofs/Multi-level roofs
20
Classroom Modules / Performance Based Work Process (First Year) - Installation Performance Based Training - Irregular roofs/Domed roofs
10
Classroom Modules / Performance Based Work Process (First Year) - Installation Performance Based Training - Irregular roofs/Domed roofs
10
Classroom Modules / Performance Based Work Process (First Year) - ULPA Basic Concept & Principal Test
2
Classroom Modules / Performance Based Work Process (First Year) - ULPA Basic Concept & Principal Test
2
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Company Safety Training/Testing (Toolbox Topics, etc.)
26
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Company Safety Training/Testing (Toolbox Topics, etc.)
26
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Basic Forklift Certification
1
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Basic Forklift Certification
1
Classroom Modules / Performance Based Work Process (Second Year) - Safety - OSHA 10 Card
10
Classroom Modules / Performance Based Work Process (Second Year) - Safety - OSHA 10 Card
10
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Job Site Analysis Forms
1
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Job Site Analysis Forms
1
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Horizontal Lifeline
1
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Horizontal Lifeline
1
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Fall Rescue
2
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Fall Rescue
2
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Use of PPE
1
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Use of PPE
1
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Safe use of hand tools
4
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Safe use of hand tools
4
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Safe use of power tools
4
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Safe use of power tools
4
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Onsite Safety Meetings
12
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Onsite Safety Meetings
12
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Use of ladders/tie off
4
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Use of ladders/tie off
4
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Use of fall protection (harness/lanyard/ropes/lifelines, etc.)
4
Classroom Modules / Performance Based Work Process (Second Year) - Safety - Use of fall protection (harness/lanyard/ropes/lifelines, etc.)
4
Classroom Modules / Performance Based Work Process (Second Year) - Review of lightning protection standard NFPA 780
· Review Chapter 4
· Chapter 4 - General Requirements
6
Classroom Modules / Performance Based Work Process (Second Year) - Review of lightning protection standard NFPA 780
· Review Chapter 4
· Chapter 4 - General Requirements
6
Classroom Modules / Performance Based Work Process (Second Year) - Review of lightning protection standard UL 96A - Review Sections 6 - 10
· Section 6 - General
· Section 7 - Materials
· Section 8 - Strike Termination Devices
· Section 9 - Conductors
· Section 10 - Grounding
6
Classroom Modules / Performance Based Work Process (Second Year) - Review of lightning protection standard UL 96A - Review Sections 6 - 10
· Section 6 - General
· Section 7 - Materials
· Section 8 - Strike Termination Devices
· Section 9 - Conductors
· Section 10 - Grounding
6
Classroom Modules / Performance Based Work Process (Second Year) - Review of lightning protection standards LPI - Thorough review of LPI-175
6
Classroom Modules / Performance Based Work Process (Second Year) - Review of lightning protection standards LPI - Thorough review of LPI-175
6
Classroom Modules / Performance Based Work Process (Second Year) - Review of lightning protection standards LPI - Thorough review of LPI-177
6
Classroom Modules / Performance Based Work Process (Second Year) - Review of lightning protection standards LPI - Thorough review of LPI-177
6
Classroom Modules / Performance Based Work Process (Second Year) - Basics of Secondary Bonding
1
Classroom Modules / Performance Based Work Process (Second Year) - Basics of Secondary Bonding
1
Classroom Modules / Performance Based Work Process (Second Year) - Basics of Equal potential/Common bonding (rebar, utilities, etc.)
1
Classroom Modules / Performance Based Work Process (Second Year) - Basics of Equal potential/Common bonding (rebar, utilities, etc.)
1
Classroom Modules / Performance Based Work Process (Second Year) - Basics of Surge Protection Devices
1
Classroom Modules / Performance Based Work Process (Second Year) - Basics of Surge Protection Devices
1
Classroom Modules / Performance Based Work Process (Second Year) - Site clean-up at site based on specific work area (trash, excess material, etc.)
1
Classroom Modules / Performance Based Work Process (Second Year) - Site clean-up at site based on specific work area (trash, excess material, etc.)
1
Classroom Modules / Performance Based Work Process (Second Year) - Perform continuity testing for bonding
1
Classroom Modules / Performance Based Work Process (Second Year) - Perform continuity testing for bonding
1
Classroom Modules / Performance Based Work Process (Second Year) - Installation Performance Based TrainingInstallation of roof circuit (all types of structures/roofs)
25
Classroom Modules / Performance Based Work Process (Second Year) - Installation Performance Based TrainingInstallation of roof circuit (all types of structures/roofs)
25
Classroom Modules / Performance Based Work Process (Second Year) - Installation Performance Based TrainingInstallation of ground rods/plate/radials
10
Classroom Modules / Performance Based Work Process (Second Year) - Installation Performance Based TrainingInstallation of ground rods/plate/radials
10
Classroom Modules / Performance Based Work Process (Second Year) - Installation Performance Based TrainingExothermic Welding
2
Classroom Modules / Performance Based Work Process (Second Year) - Installation Performance Based TrainingExothermic Welding
2
Classroom Modules / Performance Based Work Process (Second Year) - Installation Performance Based TrainingInstallation of concealed downleads
10
Classroom Modules / Performance Based Work Process (Second Year) - Installation Performance Based TrainingInstallation of concealed downleads
10
Classroom Modules / Performance Based Work Process (Second Year) - Installation Performance Based TrainingInstallation of exposed downleads
10
Classroom Modules / Performance Based Work Process (Second Year) - Installation Performance Based TrainingInstallation of exposed downleads
10
Classroom Modules / Performance Based Work Process (Second Year) - Installation Performance Based TrainingInstallation of common bonding (gas/water/electric/etc.)
2
Classroom Modules / Performance Based Work Process (Second Year) - Installation Performance Based TrainingInstallation of common bonding (gas/water/electric/etc.)
2
Classroom Modules / Performance Based Work Process (Second Year) - Installation Performance Based TrainingInstallation of concealed roof circuit rough in
25
Classroom Modules / Performance Based Work Process (Second Year) - Installation Performance Based TrainingInstallation of concealed roof circuit rough in
25
Classroom Modules / Performance Based Work Process (Second Year) - Installation Performance Based TrainingInstallation of concealed air terminal
4
Classroom Modules / Performance Based Work Process (Second Year) - Installation Performance Based TrainingInstallation of concealed air terminal
4
Classroom Modules / Performance Based Work Process (Second Year) - Installation Performance Based TrainingInstallation of secondary bonding
4
Classroom Modules / Performance Based Work Process (Second Year) - Installation Performance Based TrainingInstallation of secondary bonding
4
Classroom Modules / Performance Based Work Process (Second Year) - Apprentice Test 1 - LPI Journeyworker Installer 1
2
Classroom Modules / Performance Based Work Process (Second Year) - Apprentice Test 1 - LPI Journeyworker Installer 1
2
Classroom Modules / Performance Based Work Process (Third Year) - Safety - Company Safety Training/Testing (Toolbox Topics, etc.)
26
Classroom Modules / Performance Based Work Process (Third Year) - Safety - Company Safety Training/Testing (Toolbox Topics, etc.)
26
Classroom Modules / Performance Based Work Process (Third Year) - Safety - Repelling/Bosun Chair Certification
8
Classroom Modules / Performance Based Work Process (Third Year) - Safety - Repelling/Bosun Chair Certification
8
Classroom Modules / Performance Based Work Process (Third Year) - Safety - First Aid / CPR Certification
6
Classroom Modules / Performance Based Work Process (Third Year) - Safety - First Aid / CPR Certification
6
Classroom Modules / Performance Based Work Process (Third Year) - Safety - Use of PPE
1
Classroom Modules / Performance Based Work Process (Third Year) - Safety - Use of PPE
1
Classroom Modules / Performance Based Work Process (Third Year) - Safety - Use of ladders / tie off
16
Classroom Modules / Performance Based Work Process (Third Year) - Safety - Use of ladders / tie off
16
Classroom Modules / Performance Based Work Process (Third Year) - Safety - Use of fall protection (harness/lanyard/ropes/lifelines, etc.)
1
Classroom Modules / Performance Based Work Process (Third Year) - Safety - Use of fall protection (harness/lanyard/ropes/lifelines, etc.)
1
Classroom Modules / Performance Based Work Process (Third Year) - Safety - Onsite Safety Meetings
4
Classroom Modules / Performance Based Work Process (Third Year) - Safety - Onsite Safety Meetings
4
Classroom Modules / Performance Based Work Process (Third Year) - Safety - Excavation Training & Certification
2
Classroom Modules / Performance Based Work Process (Third Year) - Safety - Excavation Training & Certification
2
Classroom Modules / Performance Based Work Process (Third Year) - How to use blueprint scales
12
Classroom Modules / Performance Based Work Process (Third Year) - How to use blueprint scales
12
Classroom Modules / Performance Based Work Process (Third Year) - How to read specifications
1
Classroom Modules / Performance Based Work Process (Third Year) - How to read specifications
1
Classroom Modules / Performance Based Work Process (Third Year) - Use of hand tools - Utilize specific hand tools (wrenches, tape measures, screwdrivers, pliers, utility knives, socket wrenches, levels, hammer drills, etc.)
1
Classroom Modules / Performance Based Work Process (Third Year) - Use of hand tools - Utilize specific hand tools (wrenches, tape measures, screwdrivers, pliers, utility knives, socket wrenches, levels, hammer drills, etc.)
1
Classroom Modules / Performance Based Work Process (Third Year) - Use of power tools - Utilize specific power tools (demolition hammers, hammer drills, reciprocating saws, exothermic welding equipment, corded and cordless drills, etc.)
1
Classroom Modules / Performance Based Work Process (Third Year) - Use of power tools - Utilize specific power tools (demolition hammers, hammer drills, reciprocating saws, exothermic welding equipment, corded and cordless drills, etc.)
1
Classroom Modules / Performance Based Work Process (Third Year) - How to read Architectural, Structural and MEP Blueprints
1
Classroom Modules / Performance Based Work Process (Third Year) - How to read Architectural, Structural and MEP Blueprints
1
Classroom Modules / Performance Based Work Process (Third Year) - Zone of protection (formula and rules)
2
Classroom Modules / Performance Based Work Process (Third Year) - Zone of protection (formula and rules)
2
Classroom Modules / Performance Based Work Process (Third Year) - Site clean-up at site based on specific work area (trash, excess material, etc.)
1
Classroom Modules / Performance Based Work Process (Third Year) - Site clean-up at site based on specific work area (trash, excess material, etc.)
1
Classroom Modules / Performance Based Work Process (Third Year) - Review of lightning protection standard NFPA 780
· Review Chapter 5
· Chapter 5- Protection for Miscellaneous Structures and Special Occupancies
6
Classroom Modules / Performance Based Work Process (Third Year) - Review of lightning protection standard NFPA 780
· Review Chapter 5
· Chapter 5- Protection for Miscellaneous Structures and Special Occupancies
6
Classroom Modules / Performance Based Work Process (Third Year) - Review of lightning protection standard UL 96A
· Review Sections 11-15
· Section 11- Metal Bodies Subject to Direct Strike
· Section 12- Connectors and Fittings
· Section 13- Surge Protection
· Section 14- Concealed Installations
· Section 15- Structural Steel Framing
6
Classroom Modules / Performance Based Work Process (Third Year) - Review of lightning protection standard UL 96A
· Review Sections 11-15
· Section 11- Metal Bodies Subject to Direct Strike
· Section 12- Connectors and Fittings
· Section 13- Surge Protection
· Section 14- Concealed Installations
· Section 15- Structural Steel Framing
6
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Perform continuity testing for bonding
1
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Perform continuity testing for bonding
1
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Marking roof for roof pads/pavers/strips/etc.
2
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Marking roof for roof pads/pavers/strips/etc.
2
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of rebar bonding
2
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of rebar bonding
2
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of ground rods/plate/radials
4
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of ground rods/plate/radials
4
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Exothermic Welding
2
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Exothermic Welding
2
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of ground wells
4
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of ground wells
4
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of ground counterpoise
10
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of ground counterpoise
10
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of concealed downleads
10
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of concealed downleads
10
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of exposed downleads
10
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of exposed downleads
10
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of through-roof/wall connections (all types of structures)
10
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of through-roof/wall connections (all types of structures)
10
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of common bonding (gas/water/electric/etc.)
4
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of common bonding (gas/water/electric/etc.)
4
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of roof circuit (all types of structures/roofs)
10
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of roof circuit (all types of structures/roofs)
10
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of secondary bonding (all types of structures)
10
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Installation of secondary bonding (all types of structures)
10
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Remove exposed lightning protection (reroof scope of work)
4
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Remove exposed lightning protection (reroof scope of work)
4
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Reinstall exposed lightning protection (reroof scope of work)
10
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Reinstall exposed lightning protection (reroof scope of work)
10
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Excavation for ground counterpoise
10
Classroom Modules / Performance Based Work Process (Third Year) - Installation Performance Based Training - Excavation for ground counterpoise
10
Classroom Modules / Performance Based Work Process (Third Year) - Apprentice Test 2 - LPI Journeyworker Installer 2 Test
2
Classroom Modules / Performance Based Work Process (Third Year) - Apprentice Test 2 - LPI Journeyworker Installer 2 Test
2
Classroom Modules (Fourth Year) - Company Safety Training/Testing (Toolbox Topics, etc.)
26
Classroom Modules (Fourth Year) - Company Safety Training/Testing (Toolbox Topics, etc.)
26
Classroom Modules (Fourth Year) - Fall Protection for Competent Person
24
Classroom Modules (Fourth Year) - Fall Protection for Competent Person
24
Classroom Modules (Fourth Year) - Ground Resistance Testing Class
8
Classroom Modules (Fourth Year) - Ground Resistance Testing Class
8
Classroom Modules (Fourth Year) - Onsite Safety Meetings
12
Classroom Modules (Fourth Year) - Onsite Safety Meetings
12
Classroom Modules (Fourth Year) - Review of lightning protection standard NFPA 780
· Review Chapters 6-12
· Chapter 6- Protection for Heavy- Duty Stacks
· Chapter 7-Protection for Structures Containing Flammable Vapors, Gases or Liquids
· Chapter 8- Protection of Structures Housing Explosive Materials
· Chapter 9- Protection for Wind Turbines
· Chapter 10- Protection for Watercraft
· Chapter 11- Protection for Airfield Lighting Circuits
· Chapter 12- Protection for Solar Arrays
12
Classroom Modules (Fourth Year) - Review of lightning protection standard NFPA 780
· Review Chapters 6-12
· Chapter 6- Protection for Heavy- Duty Stacks
· Chapter 7-Protection for Structures Containing Flammable Vapors, Gases or Liquids
· Chapter 8- Protection of Structures Housing Explosive Materials
· Chapter 9- Protection for Wind Turbines
· Chapter 10- Protection for Watercraft
· Chapter 11- Protection for Airfield Lighting Circuits
· Chapter 12- Protection for Solar Arrays
12
Classroom Modules (Fourth Year) - Review of lightning protection standard UL 96A
· Review Sections 16-26
· Section 16- General Protection of Misc. Structures
· Section 17- Mechanical Execution of Work for Heavy Duty Stacks
· Section 18- Components for Heavy Duty Stacks
· Section 19- Corrosion Protection for Heavy Duty Stacks
· Section 20- Air Terminals for Heavy Duty Stacks
· Section 21- Conductors for Heavy Duty Stacks
· Section 22- Fasteners for Heavy Duty Stacks
· Section 23- Bonding for Heavy Duty Stacks
· Section 24- Splices for Heavy Duty Stacks
· Section 25- Metal Stacks for Heavy Duty Stacks
· Section 26- Metal Guy Wires and Cables on Heavy Duty Stacks
12
Classroom Modules (Fourth Year) - Review of lightning protection standard UL 96A
· Review Sections 16-26
· Section 16- General Protection of Misc. Structures
· Section 17- Mechanical Execution of Work for Heavy Duty Stacks
· Section 18- Components for Heavy Duty Stacks
· Section 19- Corrosion Protection for Heavy Duty Stacks
· Section 20- Air Terminals for Heavy Duty Stacks
· Section 21- Conductors for Heavy Duty Stacks
· Section 22- Fasteners for Heavy Duty Stacks
· Section 23- Bonding for Heavy Duty Stacks
· Section 24- Splices for Heavy Duty Stacks
· Section 25- Metal Stacks for Heavy Duty Stacks
· Section 26- Metal Guy Wires and Cables on Heavy Duty Stacks
12
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of ground rods/plate/radials
4
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of ground rods/plate/radials
4
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of concealed downleads
10
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of concealed downleads
10
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of exposed downleads
10
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of exposed downleads
10
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of common bonding (gas/water/electric/etc.)
4
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of common bonding (gas/water/electric/etc.)
4
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of concealed roof circuit rough in
10
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of concealed roof circuit rough in
10
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of concealed air terminals
2
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of concealed air terminals
2
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation on chimneys
4
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation on chimneys
4
Classroom Modules (Fourth Year) - Installation Performance Based Training - Marking roof for roof pads/pavers/strips/etc.
4
Classroom Modules (Fourth Year) - Installation Performance Based Training - Marking roof for roof pads/pavers/strips/etc.
4
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of rebar bonding
2
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of rebar bonding
2
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of ground wells
2
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of ground wells
2
Classroom Modules (Fourth Year) - Installation Performance Based Training - Exothermic Welding
2
Classroom Modules (Fourth Year) - Installation Performance Based Training - Exothermic Welding
2
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of ground counterpoise
10
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of ground counterpoise
10
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of through-roof/wall connections (all types of structures)
10
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of through-roof/wall connections (all types of structures)
10
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of common bonding (gas/water/electric/etc.)
2
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of common bonding (gas/water/electric/etc.)
2
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of roof circuit (all types of structures/roofs)
10
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of roof circuit (all types of structures/roofs)
10
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of secondary bonding (all types of structures)
10
Classroom Modules (Fourth Year) - Installation Performance Based Training - Installation of secondary bonding (all types of structures)
10
Classroom Modules (Fourth Year) - Installation Performance Based Training - Remove exposed lightning protection (reroof scope of work)
2
Classroom Modules (Fourth Year) - Installation Performance Based Training - Remove exposed lightning protection (reroof scope of work)
2
Classroom Modules (Fourth Year) - Installation Performance Based Training - Reinstall exposed lightning protection (reroof scope of work)
4
Classroom Modules (Fourth Year) - Installation Performance Based Training - Reinstall exposed lightning protection (reroof scope of work)
4
Classroom Modules (Fourth Year) - Installation Performance Based Training - Excavation for ground counterpoise
5
Classroom Modules (Fourth Year) - Installation Performance Based Training - Excavation for ground counterpoise
5
Classroom Modules (Fourth Year) - Installation Performance Based Training - Perform Ground Testing
4
Classroom Modules (Fourth Year) - Installation Performance Based Training - Perform Ground Testing
4
Classroom Modules (Fourth Year) - Installation Performance Based Training - Grounding – (Counterpoise Tails, Bus Bars, Riser, Raised Floor, etc.)
8
Classroom Modules (Fourth Year) - Installation Performance Based Training - Grounding – (Counterpoise Tails, Bus Bars, Riser, Raised Floor, etc.)
8
Classroom Modules (Fourth Year) - Design of basic lightning protection systems
5
Classroom Modules (Fourth Year) - Design of basic lightning protection systems
5
Classroom Modules (Fourth Year) - Job Coordination
4
Classroom Modules (Fourth Year) - Job Coordination
4
Classroom Modules (Fourth Year) - Roof Coordination
2
Classroom Modules (Fourth Year) - Roof Coordination
2
Classroom Modules (Fourth Year) - Apprentice Test 3 - LPI Master Installer 1 Test
2
Classroom Modules (Fourth Year) - Apprentice Test 3 - LPI Master Installer 1 Test
2
Classroom Modules (Fifth Year) - OSHA 30
30
Classroom Modules (Fifth Year) - OSHA 30
30
Classroom Modules (Fifth Year) - First Aid / CPR Certification
6
Classroom Modules (Fifth Year) - First Aid / CPR Certification
6
Classroom Modules (Fifth Year) - Company Safety Training/Testing (Toolbox Topics, etc.)
26
Classroom Modules (Fifth Year) - Company Safety Training/Testing (Toolbox Topics, etc.)
26
Classroom Modules (Fifth Year) - Thorough review of NFPA780
· Review of Annex A-O
· Annex A - Explanatory Material
· Annex B - Principles of Lightning Protection
· Annex C - Explanation of Bonding Principles
· Annex D - Inspection and Maintenance of Lightning Protection Systems
· Annex E - Ground Measurement Techniques
· Annex F - Protection for Trees
· Annex G - Protection for Picnic Grounds, Playgrounds, Ball Parks, and Other Open Places
· Annex H - Protection for Livestock in Fields
· Annex I - Protection for Parked Aircraft
· Annex J - Protection of Smart Structures
· Annex K - Guide to International Standards Dealing with the Selection of SPDs for use on Photovoltaic Installations
· Annex L - Lightning Risk Assessment
· Annex M - Guide for Personal Safety from Lightning
· Annex N - Reserved for Future
· Annex O - Informational References
8
Classroom Modules (Fifth Year) - Thorough review of NFPA780
· Review of Annex A-O
· Annex A - Explanatory Material
· Annex B - Principles of Lightning Protection
· Annex C - Explanation of Bonding Principles
· Annex D - Inspection and Maintenance of Lightning Protection Systems
· Annex E - Ground Measurement Techniques
· Annex F - Protection for Trees
· Annex G - Protection for Picnic Grounds, Playgrounds, Ball Parks, and Other Open Places
· Annex H - Protection for Livestock in Fields
· Annex I - Protection for Parked Aircraft
· Annex J - Protection of Smart Structures
· Annex K - Guide to International Standards Dealing with the Selection of SPDs for use on Photovoltaic Installations
· Annex L - Lightning Risk Assessment
· Annex M - Guide for Personal Safety from Lightning
· Annex N - Reserved for Future
· Annex O - Informational References
8
Classroom Modules (Fifth Year) - Thorough review of UL96A
Review of Supplement SA - Material Requirements
Re-enforce Sections 1-26
8
Classroom Modules (Fifth Year) - Thorough review of UL96A
Review of Supplement SA - Material Requirements
Re-enforce Sections 1-26
8
Classroom Modules (Fifth Year) - Review Lightning Protection Maintenance
2
Classroom Modules (Fifth Year) - Review Lightning Protection Maintenance
2
Classroom Modules (Fifth Year) - Site Clean Up
1
Classroom Modules (Fifth Year) - Site Clean Up
1
Classroom Modules (Fifth Year) - Completing Jobsite JSA/JHA’s
2
Classroom Modules (Fifth Year) - Completing Jobsite JSA/JHA’s
2
Classroom Modules (Fifth Year) - Pre-construction meetings
4
Classroom Modules (Fifth Year) - Pre-construction meetings
4
Classroom Modules (Fifth Year) - Coordination with other trades
4
Classroom Modules (Fifth Year) - Coordination with other trades
4
Classroom Modules (Fifth Year) - Perform Ground Testing
4
Classroom Modules (Fifth Year) - Perform Ground Testing
4
Classroom Modules (Fifth Year) - Installation Performance Based Training - Layout and Installation of ground counterpoise
10
Classroom Modules (Fifth Year) - Installation Performance Based Training - Layout and Installation of ground counterpoise
10
Classroom Modules (Fifth Year) - Installation Performance Based Training - Coordination and Excavation for ground counterpoise
10
Classroom Modules (Fifth Year) - Installation Performance Based Training - Coordination and Excavation for ground counterpoise
10
Classroom Modules (Fifth Year) - Installation Performance Based Training - Coordination and Installation of rebar bonding
2
Classroom Modules (Fifth Year) - Installation Performance Based Training - Coordination and Installation of rebar bonding
2
Classroom Modules (Fifth Year) - Installation Performance Based Training - Exothermic Welding
2
Classroom Modules (Fifth Year) - Installation Performance Based Training - Exothermic Welding
2
Classroom Modules (Fifth Year) - Installation Performance Based Training - Installation of ground wells
2
Classroom Modules (Fifth Year) - Installation Performance Based Training - Installation of ground wells
2
Classroom Modules (Fifth Year) - Installation Performance Based Training - Layout and Coordination of Grounding – (Counterpoise Tails, Bus Bars, Riser, Raised Floor, etc.)
8
Classroom Modules (Fifth Year) - Installation Performance Based Training - Layout and Coordination of Grounding – (Counterpoise Tails, Bus Bars, Riser, Raised Floor, etc.)
8
Classroom Modules (Fifth Year) - Installation Performance Based Training - Installation/Coordination concealed through-roof connections (reroof scope of work)
10
Classroom Modules (Fifth Year) - Installation Performance Based Training - Installation/Coordination concealed through-roof connections (reroof scope of work)
10
Classroom Modules (Fifth Year) - Installation Performance Based Training - Layout roof circuits (several types of structures/roofs)
4
Classroom Modules (Fifth Year) - Installation Performance Based Training - Layout roof circuits (several types of structures/roofs)
4
Classroom Modules (Fifth Year) - Onsite Safety Meetings
12
Classroom Modules (Fifth Year) - Onsite Safety Meetings
12
Classroom Modules (Fifth Year) - Determine zone of protection (several types of roofs/mechanical units)
4
Classroom Modules (Fifth Year) - Determine zone of protection (several types of roofs/mechanical units)
4
Classroom Modules (Fifth Year) - Determine bonding locations and requirements (roof top units/projections)
4
Classroom Modules (Fifth Year) - Determine bonding locations and requirements (roof top units/projections)
4
Classroom Modules (Fifth Year) - Coordination/Installation for chimneys
2
Classroom Modules (Fifth Year) - Coordination/Installation for chimneys
2
Classroom Modules (Fifth Year) - Job Coordination
4
Classroom Modules (Fifth Year) - Job Coordination
4
Classroom Modules (Fifth Year) - Roof Coordination/Installation
2
Classroom Modules (Fifth Year) - Roof Coordination/Installation
2
Classroom Modules (Fifth Year) - Modify design drawings to meet site requirements
2
Classroom Modules (Fifth Year) - Modify design drawings to meet site requirements
2
Classroom Modules (Fifth Year) - Design of basic and complex lightning protection systems
10
Classroom Modules (Fifth Year) - Design of basic and complex lightning protection systems
10
Classroom Modules (Fifth Year) - Apprentice Test 4 - LPI Master Installer 2 Test
2
Classroom Modules (Fifth Year) - Apprentice Test 4 - LPI Master Installer 2 Test
2