Apprentices complete a required number of hours in on-the-job training and related instruction.
Painter
Anonymous
Colorado (OA)
Documents
Coming Soon
Individual state requirements may vary. Please contact your local apprenticeship office to ensure this version is suitable to your state’s requirements.
Work Process Content
On the Job Training
Anonymous
Hours do not meet minimum OA standard for this occupation
4.7K
OJT hours
Workplace Safety
0
15
Protect structures or surfaces near work areas to avoid damage.
0
780
Remove fixtures such as pictures, door knobs, lamps, or electric switch covers prior to painting.
Apply material to fill gaps in surfaces.
0
110
Fill cracks, holes, or joints with caulk, putty, plaster, or other fillers, using
caulking guns or putty knives.
Smooth surfaces with abrasive materials or tools.
0
55
Polish final coats to specified finishes.
Review blueprints or specifications to determine work requirements.
0
60
Read work orders or receive instructions from supervisors or homeowners to determine work requirements.
Prepare surfaces for finishing.
0
390
Wash and treat surfaces with oil, turpentine, mildew remover, or other preparations, and sand rough spots to ensure that finishes will adhere properly.
Apply paint to surfaces.
0
3.1K
Apply paint, stain, varnish, enamel, or other finishes to equipment, buildings, bridges, or other structures, using brushes, spray guns, or rollers.
Assemble temporary equipment or structures.
0
60
Erect scaffolding or swing gates, or set up ladders, to work above ground level.
Mix substances or compounds needed for work activities.
0
10
Mix and match colors of paint, stain, or varnish with oil or thinning and drying additives to obtain desired colors and consistencies.
Estimate construction project and materials cost for projects.
0
15
Calculate amounts of required materials and estimate costs, based on surface measurements or work orders.
Clean surfaces in preparation for work activities.
0
30
Remove old finishes by stripping, sanding, wire brushing, burning, or using water or abrasive blasting.
Select and order construction or extraction materials or equipment.
0
10
Select and purchase tools or finishes for surfaces to be covered, considering durability, ease of handling, methods of application, and customers' wishes.
Apply sealants or other protective coatings.
0
20
Spray or brush hot plastics or pitch onto surfaces.
Apply decorative or textured finishes or coverings.
0
25
Cut stencils and brush or spray lettering or decorations on surfaces.