Station Construction and Maintenance section
a. Safety meetings and equipment inspection
b. Station wiring
c. Laying out construction work from blueprints
d. Installation, adjustment, repair and maintenance of
switching equipment OCB'S, ACB'S, load interrupters
disconnect switches and vacuum breakers
e. Wiring and testing of control circuits
f. Installation and maintenance of transformers
g. Installation and maintenance of rotating equipment,
including motors, generators, synchronous condensers,
pumps and fans
h. Wiring and installation of switchboards and switchboard
equipment
i. Installation and maintenance of batteries and battery
chargers
j. Installation and maintenance of high capacity rectifiers
k. Installation and maintenance of voltage regulators step
regulators and tap changers
l. Rotation and phasing
m. Clearance procedure: requesting a clearance, pick up and
receiving a clearance, tailboard conferences, hot testing,
grounding, keep open, hold open, releasing clearances,
switching orders, and procedures.
n. Capacitor banks: Installation, maintenance and hazards
o. Bushings: Installation, repair and complete rebuilding of
bushings
p. Troubleshooting equipment malfunctions
q. Conduit bending, manual hand bender, hydraulic bender,
and power hydraulic bender
r. Tower climbing and tower rescue
s. Ladders, handling and safety
t. Power man lift equipment and safety
u. Poly cable splicing and terminating
v. Vault rescue
w. Setting up safe work area, traffic coning and flagging
x. Radio communications, operating use of in an emergency
y. Use of test equipment, ductor, multimeter, amprobe,
megger, von test, SF6 gas test, fault gas test
z. Rigging, lifting, moving of heavy objects with mobile truck
crane or winches
aa. National, State and City Electrical Code
ab. Substation and field inspections
ac. Protective Devices
ad. Isolating and disconnecting devices