Cable Installation Component
1. (Based on BICSI Training Standards)
a. Background Information
b. Industry Orientation
c. Structured Cabling Systems
d. ANSI/TIA/EIA Standards
e. Blueprint Reading
f. Media (Shielding, Unshielded, CoAx) Connectorization
g. Transmission (Power, Frequency and Analog, Copper Fiber)
h. Grounding and Bonding Common Safety Practices
(First Aid, Protective Environs) Professionalism (Appearance)
2. Planning
a. Drawings
b. Material Lists
c. Scope of Work
d. Contract
e. Project Schedule
f. Site Survey
g. Materials
h. Materials Ordered and Received Storage of Materials Log strategy
3. Installing Supporting Structures
a. Set Up Telecom Closets
b. Installing Grounding Infrastructure
c. Installing Cable Support Systems
4. Pulling Cable Pulling Cable Setup
a. Pulling Horizontal Cable
b. Pulling Vertical Cable
c. Pulling Fiber Optic Cable
d. Restoring Fire Rating Penetrations
5. Terminating Cable
a. PreTerminating Functions
b. Copper IDC Termination
c. Coaxial Cable Termination
d. Fiber Termination
6. Splicing, Testing and Troubleshooting Cable
a. Copper Splicing, Testing, and Troubleshooting
b. Optical Fiber Splicing, Testing, and Troubleshooting
7. Retrofitting
a. Analysis of Current Infrastructure
b. Planning Retrofit Installation