Hybrid programs blend both competency- and time-based strategies,
using a minimum and maximum range of hours for each major job
function and the successful demonstration of identified competencies.
using a minimum and maximum range of hours for each major job
function and the successful demonstration of identified competencies.
Glazier, Stained Glass
Anonymous
North Carolina (SAA)
Documents
View Redacted Document
Personal and employer info redacted
Individual state requirements may vary. Please contact your local apprenticeship office to ensure this version is suitable to your state’s requirements.
Work Process Content
On the Job Training
Anonymous
108
Skills
Hours do not meet minimum OA standard for this occupation
1.7K
OJT hours
Year One - Block 1A
17
20
Year One - Block 1A
17
20
- Complete course certification for boom supported elevated work platform (aerial boomlift), and self-propelled elevating Work platform (scissor lift). Theory and Hands-On.
- Complete course certification for rough terrain forklift (power source: Diesel, gasoline/propane. Theory and Hands-On.
- Complete first aid course. Theory.
- Complete CPR course. Theory.
- Demonstrate proficiency to receive, sort, store, protect vendor/MFG (aluminum) materials.
- Demonstrate proficiency to receive, sort, store, protect vendor/MFG (glass) materials.
- Demonstrate proficiency to straight line score, run line break out on 1/16" thru 1/4" sheet glass/ plastic/lexan.
- Demonstrate proficiency to pattern scores, run line break out on 1/8" thru 1/4" sheet glass/plastic/ lexan.
- Demonstrate proficiency to seam/polish
- Demonstrate proficiency to core/notch
- Demonstrate proficiency to apply edge back film on glass.
- Demonstrate proficiency to load/protect/secure glass on BED ("A" frame) small and large glass trucks.
- Demonstrate proficiency to cut/drill/assemble vendor/MFG aluminum frame members and accessories.
- Demonstrate proficiency in use of hardware templete(s) to core/drill/notch blank door leafs and door frames.
- Demonstrate proficience to apply hardware to prepped door leafs and door frames.
- Demonstrate proficiency to K.D. assemble/prep/glaze pre-MFG systems IE: vent(s)/screens.
- Demonstrate proficiency to load/block/secure/protect assembled frames/accessories in box truck/flatbed for delivery.
Year One - Block 1B
20
3
Year One - Block 1B
20
3
- Demonstrate proficiency in vinyl/wood /steel/window glass replacement(s) (glass only). Residential
- Demonstrate proficiency in nail fin/straight vinyl/wood window(s) (complete unit). Residential.
- Demonstrate proficiency in residential mirror installation(s). Dressing/partial or full wall.
- Demonstrate proficiency in residential framed shower installation.
- Demonstrate proficiency in residential framed/unframed sliding tub enclosure(s).
- Demonstrate proficiency in residential heavy glass shower door/enclosure(s)
- Demonstrate proficiency in residential vinyl/alum. sliding patio door(s)
- Demonstrate proficiency in residential glass shelving system(s) installation(s).
- Demonstrate proficiency in residential storm door installation(s).
- Demonstrate proficiency in residential install or small/large table top(s) glass.
- Demonstrate proficiency in city service aluminum door replacement(s).
- Demonstrate proficiency in city service aluminum door trouble shooting to access corrective
- Demonstrate proficiency in city service door closer(s) installation(s). Top mount/parallel/overhead concealed.
- Demonstrate proficiency in city service storefront glass replace(s).
- Demonstrate proficiency in city service curtainwall glass replacement(s).
- Demonstrate proficiency in city services sneeze guard/privacy glass installation(s). Showcase(s).
- Demonstrate proficiency in city services storefront, curtainwall frames re-configuration(s).
- Demonstrate proficiency in city service small frame/glass/sealant turn key installation(s).
- Demonstrate proficiency in city service tray(s)/mail slot(s) Installation.
- Demonstrate proficiency in city service borrowed lites/sandwich K.D. Glass installation(s).
Year One - Block 1C
14
75
Year One - Block 1C
14
75
- Demonstrate proficiency in compliances to site specific safety/site rule(s) set forth by G.C. in addition to Al Glass & Aluminum requirements.
- Demonstrate proficiency in field verification/field measuring of openings prior to production.
- Demonstrate proficiency to identify fastener type(s)/shim type(s), bit type(s).
- Demonstrate proficiency to identify sealant type(s).
- Demonstrate proficiency for interpretation of blueprints.
- Demonstrate proficiency in use of optical instrument(s).
- Demonstrate proficiency in sketching and take-offs.
- Demonstrate proficiency to identify finished and coatings.
- Demonstrate proficiency in proper care and use of ladder(s), forklift.
- Demonstrate proficiency in proper rigging and hoisting procedures/signaling.
- Demonstrate proficiency to adhere to Al Glass & Aluminum approved shop drawing(s)/MFG- system installation instructions.
- Demonstrate proficiency in fill out-turn site Al Glass & Aluminum form(s)/
- Demonstrate proficiency in receipt/verification/sorting distribution of aluminum frame(s), member(s), accessorie(s).
- Demonstrate proficiency in receipt/verification/sorting/distribution of glass.
Year One - Block 1D
7
20
Year One - Block 1D
7
20
- Demonstrate proficiency in large scale multi family nail fin vinyl window installation(s).
- Demonstrate proficiency in large scale commercial receptor/continuous clip/strap anchor aluminum windows.
- Demonstrate proficiency in large scale storefront installation (frame/glass).
- Demonstrate proficiency in single span curtail wall installation (frame/prep/gaskets/glass/pressure plates/cover.
- Demonstrate proficiency in perimeter sealant(s). Primer(s)/bond breaker tape/rod stop/pull test(s).
- Demonstrate proficiency in post applied panning/post applied muntin(s)/sun control system(s).
- Demonstrate proficiency to conduct quality assurance and water field check of installed and scope glazing systems.
Year Two - Block 2A
3
150
Year Two - Block 2A
3
150
- Demonstrate proficiency in window wall system(s) installation(s)/all aspect(s), receptor(s), frame(s), glass, sealants.
- Demonstrate proficiency in ribbon wall system(s) installation(s)/all aspect(s).
- Demonstrate proficiency in slope glaze system(s), sky light system(s) installation(s). All aspects/ rafters/perlins/end over/matal flashings/pressure plate/cover/sealant.
Year Two - Block 2B
4
80
Year Two - Block 2B
4
80
- Demonstrate proficiency in fire rated system(s) installation(s). All aspects/tube steel grid/fire brick plates/fire rated glass/louver/perimeter mineral wool pack/rated sealant/color match sealant/ rated door leaf/hardware.
- Demonstrate proficiency in ballistic rated system(s), blast mitigation system(s). All aspects/framing with internal steel/glass/door leaf/hardware/sealant.
- Demonstrate proficiency in hurricane resistant building front system(s). All aspects/framing/glass/ door leaf/perimeter sealant(s).
- Demonstrate proficiency in exterior/interior structural sealants.
Year Two - Block 2C
5
85
Year Two - Block 2C
5
85
- Demonstrate proficiency in door sub frames insert/door leaf/hardware installation(s).
- Demonstrate proficiency in sliding door insert installation(s).
- Demonstrate proficiency in louver insert installation.
- Demonstrate proficiency in terrace unit insert/casement window insert.
- Demonstrate proficiency in manual revolving door system(s) installation(s).
Year Two - Block 2D
3
200
Year Two - Block 2D
3
200
- Demonstrate proficiency in single skin metal panel/breakmetal installation(s). All aspects/cut/bend/ care/notch.
- Demonstrate proficiency in insulated metal panel (IMP) system(s), installtion(s). All aspects/”Z” girts/ “Z” clip/flashings/sealant(s).
- Demonstrate proficiency in metal composite material (MCM) system(s), installation(s). All aspects/ ”Z” girt/”Z” clip/flashing sealant.
Year Three - Block 3A
4
100
Year Three - Block 3A
4
100
- Demonstrate proficiency in point suspended glass wall systems. All aspects of installation(s).
- Demonstrate proficiency in architectural frameless glass handrail system(s). All aspects of Installation(s).
- Demonstrate proficiency in architectural post railing sysem(s). All aspects of installation.
- Demonstrate proficiency in cap railing system(s). All aspects of installation(s).
Year Three - Block 3B
6
80
Year Three - Block 3B
6
80
- Demonstrate proficiency in welded post railing system(s). All aspects of installation(s).
- Demonstrate proficiency in Juliet balcony railing system(s). All aspects of installation(s).
- Demonstrate proficiency in security barrier systems. All aspects of installation.
- Demonstrate proficiency in gate system(s). All aspects of installation.
- Demonstrate proficiency in glass windscreen system(s) installation. All aspect(s) of installation.
- Demonstrate proficiency in smoke baffle system(s). All aspects.
Year Three - Block 3C
5
75
Year Three - Block 3C
5
75
- Demonstrate proficiency in proper care and use of electric winch, mini crain, glass manipulator(s) and handler(s).
- Demonstrate proficiency in proper care and use of swing stage.
- Demonstrate proficiency in proper coordination, communication, with other related trade(s).
- Demonstrate proficiency in proper care and use of loading edge floor line landing/loading platform. Attach/usage/detach to upper loading edge floor line.
- Demonstrate proficiency in proper communication and use of worker/material buckhoist.
Year Three - Block 3D
3
200
Year Three - Block 3D
3
200
- Demonstrate proficiency in embed lay-out and verification.
- Demonstrate proficiency by use of optical instruments, bench mark’s and control lines, construction documents.
- Demonstrate proficiency in mechanical fasteners, I.E. Windload and deadload clips, embed(s).
Year Four - Block 4A
2
350
Year Four - Block 4A
2
350
- Demonstrate proficiency to receive/verify/distribute/sort units/accessories to required floor line(s).
- Demonstrate proficiency in multi-span stick built curtain wall, outside, inside glazed and captured. installation all aspects/steel clip/erection/splices/anchor/prep/glaze/pressure plates/cover/sealant.
Year Four - Block 4B
3
100
Year Four - Block 4B
3
100
- Demonstrate proficiency in preglazed unitized window wall installation. All aspects.
- Demonstrate proficiency in preglazed unitized ribbon wall installation. All aspects.
- Demonstrate proficiency in slab edge cover installation. All aspects.
Year Four - Block 4C
4
75
Year Four - Block 4C
4
75
- Demonstrate proficiency in unitized starter track, lay-out, anchor, and elevation to benchmark installation.
- Demonstrate proficiency in silicone sheet splice sleeves? At starter track chicken head installation.
- Demonstrate proficiency in unit placement and male/female lock/snap mating installation.
- Demonstrate proficiency in placed unit(s) elevating to benchmark point installation.
Year Four - Block 4D
8
50
Year Four - Block 4D
8
50
- Demonstrate proficiency in floor line transfer of mini-crain, glass manipulator.
- Demonstrate proficiency in stacking units per floor on elevation bench mark(s) up building to unit top out installation.
- Demonstrate proficiency in parapet cap and splice sleeve installation.
- Demonstrate proficiency in fire barrier, smoke barrier, installation. All aspects.
- Demonstrate proficiency in stool trim installation.
- Demonstrate proficiency in interior film applied protection, roll on water based protection installation.
- Demonstrate proficiency in minf-crain, glass manipulator, swing stage break down and removal from project.
- Demonstrate proficiency in addressing final completion items, punch list items.
Related Instruction Content
Training Provider(s):
National Glass Association with GANA
Safety and Anti-Harassment training is included in all aspects of Related Instruction.
Safety and Anti-Harassment training is included in all aspects of Related Instruction.
History of Glass
History of Glass
Introduction to Glazing Practices
Introduction to Glazing Practices
Glazing Math Essentials
Glazing Math Essentials
Interpreting Common Documents
Interpreting Common Documents
PPE for Working with Flat Glass
PPE for Working with Flat Glass
Safe Glass Handling 101
Safe Glass Handling 101
Best Practices for Removing Broken Glass
Best Practices for Removing Broken Glass
OSHA 30
OSHA 30
Employee Safety Guide
Employee Safety Guide
Hand and Power Tool Safety for Construction
Hand and Power Tool Safety for Construction
Basic Rigging Awareness
Basic Rigging Awareness
Aerial Lifts and Scissor Lifts
Aerial Lifts and Scissor Lifts
Fall Protection
Fall Protection
Scaffold Safety Awareness
Scaffold Safety Awareness
Powered Industrial Trucks
Powered Industrial Trucks
GANA Glazing Manual
GANA Glazing Manual
The Float Glass Manufacturing Process
The Float Glass Manufacturing Process
Basics of Insulating Glass Units
Basics of Insulating Glass Units